20GP vs 40GP vs 40HQ: how much furniture fits in a container

Date Published

Furniture fills a container by volume, not by weight

The question a buyer actually asks is not "what is a 40HQ?" but "I have 60 sofas and 200 dining chairs — do I book one 40HQ or two 40GPs?" The answer comes from carton dimensions, not from the container's payload. Convert the order into cartons and cubic metres first, then pick the box that fits it.

Every container has two limits: internal volume (how much space is inside) and maximum payload (how many kilograms it may carry). In most furniture orders the volume runs out long before the weight does — a container of sofas and chairs is mostly air and cardboard. The exceptions are worth naming: stone and marble tops, metal frames, safes, dense hardwood pieces and anything crated in thick timber. Those orders can approach a weight limit while the box still looks half empty.

Three terms are used throughout this guide:

  • CBM — cubic metres. Length × width × height, all in metres.
  • Carton CBM — the packed shipping volume of the export carton, not the assembled product size. A knock-down table ships far smaller than it stands.
  • Usable CBM — what you can realistically load once gaps between cartons, the door frame and floor losses are taken into account.

The rule this article builds toward: plan and price per usable CBM, then compare containers on cost per usable CBM delivered — not on the brochure capacity and not on the freight quote alone.

Key points

  • Convert the order to carton CBM and kilograms before choosing a container.
  • Compare 20GP, 40GP and 40HQ on usable CBM after a loading allowance, not nominal capacity.
  • The 40HQ's extra internal height is the difference that matters for tall or stackable furniture.
  • Check tall items against the door opening, not just the internal height.
  • Decide on landed cost per unit, including per-container destination charges.

What each container actually gives you

The three standard dry boxes differ in only two ways that matter to a furniture buyer: floor length, and internal height. A 40GP is roughly twice the length of a 20GP; a 40HQ (high cube) has the same footprint as a 40GP with more headroom.

The figures below are the indicative internal defaults used by Furnishpedia's Container Load Calculator, with the volume columns computed from those dimensions. They are planning defaults, not a carrier specification sheet.

ContainerInternal L × W × H (cm)Volume from these dimensions (m³)Usable CBM at a 5% allowanceIndicative max payload (kg)
20GP589 × 235 × 23933.131.428,200
40GP1203 × 235 × 23967.664.226,700
40HQ1203 × 235 × 26976.072.226,500

Internal dimensions and payloads are the calculator's indicative defaults; the volume columns are calculated from them. Confirm the actual box with your forwarder.

Why nominal capacity is not what you load

Cartons are rectangular blocks of fixed sizes, and a mixed furniture order rarely tiles a container perfectly. There will be gaps at the walls, a strip of unusable height above a stack, and space lost at the doors. That is why it is worth planning on a loading allowance rather than the geometric number. Our calculator applies an allowance for dunnage, bracing and door clearance that you can set from 0% to 15%; we default it to 5% as a common planning assumption, and 0% gives you only a theoretical maximum. Treat any allowance as an assumption to test against your own packing list, not a guarantee.

The height difference is the one that changes furniture loads

The 40HQ's extra internal height over a 40GP is often worth more than floor area for tall, light items. A cabinet carton that stacks two-high within 269 cm but not within 239 cm effectively halves the floor it needs. For low, dense cargo the extra height buys nothing.

The door opening is a separate, hard constraint. An assembled wardrobe or a long sofa can clear the internal height and still fail to pass through the door frame, because the opening is smaller than the internal cross-section. Ask the forwarder for the door dimensions of the actual box before committing an oversized piece.

Dimensions vary by box

Nominally identical containers differ by carrier, build year, floor thickness and wall lining. For oversized or borderline pieces, ask your forwarder for the confirmed internal dimensions and payload of the actual container and enter them under Advanced options in the calculator. Road haulage limits at origin and destination can also be lower than the container's own payload.

Build a CBM-per-unit table before you choose a container

You cannot choose a container from a product catalogue. You choose it from an export packing list.

  1. 1

    Get the export packing list — ask the factory for carton dimensions, cartons per unit, gross weight per carton, and whether each item ships knock-down (KD), semi-KD or fully assembled.

  2. 2

    Calculate carton CBM per unit — length × width × height in metres, multiplied by cartons per unit. Put every SKU in one table with quantity, total CBM and total kilograms.

  3. 3

    Flag the SKUs where packing changes everything — KD dining tables versus assembled, compressed-roll mattresses versus flat, nested chairs versus boxed singles. These are the lines where a small packing change moves the whole container decision.

A table structure you can copy straight into a spreadsheet:

SKUPacking typeCarton dims (cm)Cartons/unitCBM/unitQtyTotal CBMTotal kg
KD / semi-KD / assembledL × W × H

Leave the cells to your supplier's measured figures. Published "typical" carton volumes for a sofa or a wardrobe vary too much between factories to plan a booking on, which is exactly why the packing list has to come first.

Two quoting traps

Watch for suppliers quoting product CBM instead of carton CBM — the assembled size tells you nothing about what ships. And treat "it all fits one 40HQ" without an SKU breakdown as an unverified claim, not a loading plan.

Once the table exists, enter the carton dimensions, units per carton, gross weight and stackability into the Container Load Calculator. It is free, runs in your browser with no login, and returns estimated cartons and units for 20GP, 40GP and 40HQ plus a weight check, using dimension-fit maths where each axis is rounded down. It is captioned "Educational estimate, not a quote." — and that is exactly what it is.

A worked example: one mixed order, three container options

The order below is hypothetical and illustrative. The carton sizes and weights are invented to show the arithmetic, not measured supplier data. Replace every number with your own packing list.

LinePackingCarton (cm)CartonsCBMGross kg
12 three-seat sofasAssembled, not stackable210 × 95 × 881221.07660
40 dining tablesKD, one carton each150 × 90 × 204010.801,520
180 dining chairsNested, 2 per carton95 × 55 × 509023.511,620
20 tall cabinetsAssembled, stackable 2-high100 × 60 × 1252015.001,200
Total162≈70.45,000

Step one: compare volume, then weight

About 70.4 CBM against usable capacities of roughly 31.4 (20GP), 64.2 (40GP) and 72.2 (40HQ) at a 5% allowance. The order clearly overflows a 40GP and sits just inside a 40HQ. At 5,000 kg it is nowhere near any of the three payloads — this is a volume problem, as most furniture orders are.

Step two: check the stacking, not just the total

The cabinets are the deciding line. Two-high they need 250 cm of internal height: available in a 40HQ at 269 cm, not in a 40GP at 239 cm. In a 40GP they would have to sit single-layer on the floor, taking floor area the twelve floor-loaded sofas already need. That is how an order can overflow a 40GP on a stacking constraint even when the raw cubic totals look close.

The opposite case is just as common. Take an illustrative order of 60 crated stone dining tops at 120 × 80 × 15 cm and 180 kg per crate: about 8.6 CBM but nearly 11 tonnes. That fits a 20GP comfortably on both volume and weight, and booking a 40ft box for it would buy empty space.

Step three: decide what to do with leftover volume

If your order lands just under a container's usable capacity, you have three options, and each moves per-unit freight differently:

  • Top up with small flat-pack items you will sell anyway — usually the cheapest way to use space you have already paid for.
  • Split into a full container plus an LCL consignment for the remainder.
  • Move to two containers, which only makes sense if the second is genuinely filled.

Floor loading versus stacking

Sofas and assembled cabinets that cannot be stacked leave air above them. A container described as "full" by the factory can be well under its nominal cubic capacity because the floor is covered while the upper half is empty. This is why the calculator asks whether cartons are stackable, and why floor-loaded orders should be judged on floor area as well as CBM.

Rerun these numbers with your own packing list in the Container Load Calculator rather than trusting the example — the method transfers, the figures do not.

When to book a 20GP, a 40GP, a 40HQ — or ship LCL

Choose on the shape of the order, then confirm on cost per usable CBM.

  • 20GP — small orders, or dense, heavy, low cargo where weight rather than space is the binding limit.
  • 40GP — a large volume of standard-height cartons that stack cleanly within normal internal height.
  • 40HQ — tall, light, bulky or stackable cartons that benefit from the extra headroom.
  • LCL — below roughly one container's worth, it is worth comparing LCL against the smallest FCL on total landed cost rather than on the freight line alone.

Crane above stacked shipping containers at a container port

Illustrative photo, not this business.

Cost per usable CBM, not cost per container

A larger box does not usually cost proportionally more than a smaller one, so the bigger container commonly wins on cost per usable CBM once it is genuinely filled. The condition matters: a half-empty 40HQ is worse per unit than a full 20GP. Ask your forwarder for current rates on your specific lane and date — ocean freight moves too quickly for any published range here to stay useful, and a quote for your own port pair is the only figure worth planning on.

The costs that are not freight

Several charges are levied per container rather than per cubic metre, and they change the answer:

  • Destination terminal handling and documentation, typically charged per container.
  • LCL destination handling and deconsolidation, which can make a small LCL shipment less attractive than the freight rate suggests.
  • Inland trucking, and any access or weight limits at the delivery site.

Then there are the practical constraints buyers forget until the truck arrives: warehouse door height, whether there is an unloading dock, container drop-off access at the address, and whether the consignee can devan a floor-loaded 40HQ without a forklift.

Freight is one line in the total. Run the alternatives through the Landed Cost Calculator, which takes FOB price per unit, freight per container (with container type) or per CBM, insurance, your own duty and VAT/GST percentages, broker and port fees and inland delivery, and returns landed cost per unit with a product/freight/duty/tax/fees breakdown. Duty rates are never hard-coded — you enter them, with reference links to UK Trade Tariff, EU TARIC, US HTS and GCC customs. For the wider import picture, see our guide to importing furniture from China to the UK.

Get the packing and loading plan in writing

A container decision is only as good as the packing behind it, so put the packing in the purchase order.

Specify, per SKU: carton dimensions and CBM, maximum stack height, corner and edge protection, and whether floor loading is acceptable. Then ask for the factory's loading plan or container sketch before booking, and photographs of the loaded container plus the seal number at departure.

For transit protection, agree desiccants or a container liner where the route and season warrant it, kiln-dried moisture content for solid wood, and cartons kept off the container walls rather than pressed directly against steel that can sweat.

Wood packaging rules apply to the packaging, not the furniture

Wood packaging material used with furniture shipments — crates, pallets, dunnage — falls under the ISPM 15 standard, which sets out debarking, an approved treatment and an internationally recognised mark; wood processed so that it is free from pests, such as plywood, is excluded from its scope (IPPC / FAO, ISPM 15, 2017).

For UK imports, GOV.UK guidance requires heat treatment to 56°C for at least 30 continuous minutes throughout the wood profile including its core, debarked wood, and a mark carrying the ISO two-letter country code, treatment and producer on two opposite vertical surfaces; a legible ISPM 15 mark replaces certificates.

The furniture itself is a different matter. Defra's Plant Health Portal stated in 2021 that manufactured or processed wooden items are not wood packaging material and do not require a phytosanitary certificate, pre-notification or ISPM 15 compliance (Defra Plant Health Portal). Confirm the requirements for your own destination market rather than assuming one universal rule.

Verifying "it fits one 40HQ"

Recalculate from the packing list, ask which SKUs are KD, and check the tall items against the door opening of the actual box. If the forwarder is consolidating cargo from more than one factory, establish who owns the loading decision — the factory's sketch is not the final stowage plan once other cargo shares the box.

Your pre-booking checklist

The sequence is: packing list → carton CBM per SKU → total CBM and kilograms → usable-CBM comparison → cost per usable CBM → landed cost per unit → book.

Six things to confirm before you release the booking:

  1. Carton dimensions confirmed in writing by the factory, per SKU.
  2. Stacking limits agreed, including maximum stack height and whether floor loading is acceptable.
  3. Tall and oversized items checked against the door opening, not just internal height.
  4. Container type justified by volume or by weight — and you know which one governs.
  5. Destination charges, inland trucking and site access checked, including unloading capability.
  6. Loading plan required before booking, and loaded-container photos plus seal number at departure.

Be honest about the limits of any guide, including this one: container specifications vary by box, freight rates move, and every supplier's packing differs. The method holds; the numbers must be re-checked per order.

Run your order through the load calculator, then send the packing list to your shortlisted factories and ask them to confirm the container type in their quotation.

Ready to source?

Sourcing requests are free for buyers. Send your product list, quantities and target market, and we will pass it to manufacturers that fit.

Post a Sourcing Request

Sources

About the Author